50 SKY SHADES - World aviation news

Irkut Corporation delivered MC-21 fuselage to TsAGI for static tests

Download: Printable PDF Date: 15 Aug 2016 18:10 (UTC) category:
Publisher:
Irkut Corporation delivered MC-21 fuselage to TsAGI for static tests - Manufacturer publisher
Tatjana Obrazcova
Country: Russian Federation Aircraft: Airplanes

Irkut Corporation delivered to Central AeroHydrodynamic Institute named after professor N.E.Zhukovsky (TsAGI) the MC-21 fuselage designated for static tests to confirm the strength characteristics of the new aircraft and to provide certification of the type for static strength.

On August 12, the MC-21 fuselage was delivered to Zhukovsky from Irkutsk by An-124 freighter. In the near future other parts of the airframe will arrive to TsAGI. In particular, Irkutsk Aviation Plant, a branch of Irkut Corporation where MC-21 fuselage was assembled, will hand over auxiliary power unit compartment.

Irkut Corporation’s specialists, together with the employees of TsAGI and cooperation companies, will perform airframe assembly.

The first stage of the airframe test includes leaks inspection.

Then TsAGI specialists will initiate static tests which include simulation of structural loads in all flight modes with registration of stress-strain state of the aircraft structure.

The purpose of tests comprises experimental verification of static strength, checks of correctness of calculation methods of strength, and fine-tuning of the finite element models based on experimental data.

TsAGI has already conducted tests of a large number of elementary and structurally-similar patterns, including several types of panels, cross and longitudinal joints.

Tests of fuselage compartment, structurally-similar patterns of tail and fin box are being held. The preparation for the isolated testing of composite-made wing box, stabilising fin and high-lift device is being performed.

Ongoing and planned tests are performed to verify the ability of the new MC-21 aircraft structure to perceive design loads without breaking and without receiving unacceptable permanent deformations. This is an important part of a comprehensive test plan, implemented to perform the first flight of MC-21 and its subsequent certification.





Recommended

ExecuJet MRO Services Australasia successfully completes 20-Year heavy maintenance inspection on Indonesian Legacy 600

ExecuJet MRO Services Australia successfully completed a major 20-year scheduled airframe inspection on an Indonesian-registered Embraer Legacy 600 at its Sydney facility, further demonstrating t...

Japan Airlines strengthens E-Jet operations with renewed Embraer Pool Program agreement

Embraer and Japan Airlines have strengthened their long-standing collaboration through a new multi-year agreement under Embraer’s Pool Program, ensuring continued maintenance, repair, and spare-...

KlasJet receives key FAA approval to launch ACMI and charter services in the US market

KlasJet has achieved a significant milestone by obtaining Part 129 Operations Specifications (OpSpecs) approval from the FAA, paving the way for the company's expansion into the U.S. market. As pa...

Star Alliance Paris CDG Lounge remains the World's Best Airline Alliance Lounge

The Star Alliance Lounge at Paris Charles de Gaulle Airport has been named the World’s Best Airline Alliance Lounge at the 2026 Skytrax World Airline Awards, securing the prestigious title for a...

Android Apps development in Riga, Latvia